1st and 2nd can instillation 15th June 2015

mbawpLeave a Comment

2nd can being moved into place. The 1st and 2nd can went in on the 15th June 2015. The 2nd can was ahead of schedule as it was meant to go in on 16th June.

Sustainable Tourism, Slim Tower, Observation Platform, Curved Double Glazing, Slender Steel, Architecture, Vertical Structure, Design

Leave a Reply